| Location | Tilbury Distribution Centre |
| Value circa | £300,000 |
| Duration | Contract started late October 2014, 8 week duration |
| Scope | Bulk excavation, cut to fill Soil modification and stabilisation Place compact and trim granular materials |
| Description | Distribution Centre |
| Key issues | Detailed work sequence for sectional handover of the building platform Value engineered solution using soil stabilisation to avoid unsuitable material within the building footprint and produce a piling mat |
| References | Available on Request from Eddie Ronald: 07714 287 108 or Kevin Collins: 07587 034 438 |
| Contact | Eddie Ronald, Operations Director 07714 287 108 |