Location | Momentum, London |
Value Circa | £ 540,000 |
Duration | Contract started Dec 2022 – Jan 2023, 4 Month Duration |
Scope | Bulk Earthworks & Modification |
Description | Site scrape depth 100mm, topsoil strip depth 300mm, form temporary surface water attenuation, excavate to reduce levels within cut profile, fill to formation. Soil modification of site won materials to achieve 3% CBR in 300mm layers. SGE’s scope also included place of site-won and imported granular material, place only imported topsoil, place only Terram and load only disposal off-site of all surplus topsoil and muck materials. |
Key Matters | Form temporary attenuation by excavating to reducing levels within temporary surface water attenuation sump. Hard breakout of obstruction below the ground. |