Contract was carried out June-August 2019 Feb-April 2020 – 23-week programme over two visits.
Scope
The production of a distribution unit with infrastructure roads, ponds and landscape bunds and ditches.
Description
Strip and stockpile topsoil for offsite disposal and reuse, cut and fill to finished levels, lime modify the building footprint piling mat, import and place type 1 to finished design, cut and re soil ponds and bunds and ditches.
Key issues
World war 2 ordinance watching brief, borrow pit excavation and backfill strategy, value engineering.