
| Location | DPD, Washington |
| Value Circa | £ 530,000 |
| Duration | Contract started March 2021 – June 2021 3 Month Duration |
| Scope | Bulk Earthworks, Soil Stabilisation & Modification |
| Description | Warehouse Units |
| Key Matters | Topsoil strip: depth 350mm haul and placed into soft landscaping Hard landscaping to reduce levels and stockpiled Hard breakout of existing steps & the like placed into stockpile Crushing of site-won materials, Excavation to reduce levels Filling to make up levels Stabalilsation to Achieve 30% CBR Imported granular material. |
| Reference | Available on request from Ross Heron; 07811 835858 |
| Contact | Ross Heron, Senior Quantity Surveyor; 07811 835858 |






