Location | DPD, Washington |
Value Circa | £ 530,000 |
Duration | Contract started March 2021 – June 2021 3 Month Duration |
Scope | Bulk Earthworks, Soil Stabilisation & Modification |
Description | Warehouse Units |
Key Matters | Topsoil strip: depth 350mm haul and placed into soft landscaping Hard landscaping to reduce levels and stockpiled Hard breakout of existing steps & the like placed into stockpile Crushing of site-won materials, Excavation to reduce levels Filling to make up levels Stabalilsation to Achieve 30% CBR Imported granular material. |