DPD, Washington

Location DPD, Washington Value Circa  £ 530,000  Duration Contract started March 2021 – June 2021 3 Month Duration  Scope Bulk Earthworks, Soil Stabilisation & Modification   Description Warehouse Units  Key Matters Topsoil strip: depth 350mm haul and placed into soft landscapingHard landscaping to reduce levels and stockpiledHard breakout of existing steps & the like placed into…

Details

Quintus, Burton on Trent

Location Quintus, Burton on Trent – Bulk Earthworks Value Circa  £ 440,000  Duration Contract started June 2021 – September 2021, 3 Month Duration  Scope Bulk Earthworks, Soil stabilisation & Modification   Description  Ground Stabilisation for new warehouse units  Key Matters Topsoil strip to create a stockpile, Excavation to reduce levels, filling to make up levels, stabilised…

Details

Didcot Power Station

Location Didcot Power Station, Bulk Earthworks & Soil StabilisationErith Contractors Value Circa  £628,132.50  Duration Contract started November 2019 – December 2019, 7 Weeks Duration   Scope Bulk Earthworks & Soil Modification Description  Fill of Power Station Key Matters Footprint Inherit materials suitability, working alongside othertrades in close proximity.  Reference Available on request from Ross Heron; 07811 835858…

Details

Graze Hill, Bedford

Location Graze Hill, Bedford – Bulk Earthworks Value Circa  £ 350,000  Duration Contract started July 2021 – September 2021, 2 Month Duration  Scope Bulk Earthworks  Description  Housing Development  Key Matters  Topsoil strip to create stock pile, Excavation to reduce levels, Filling to make up levels, Formation of road box, Stabilisation & modification to achieve 30%…

Details

Mickle Well Park, Daventry

Location Mickle Well Park, Daventry Orbit Homes Value Circa  £1,915,000.00  Duration Contract started May 2019 – December 2019, 7 Month Duration  Scope Bulk Earthworks, Soil Stabilisation & Modification   Description  Infrastructure to a new Housing Development based in Daventry.  Key Matters Principle contractor responsibilities, existing underground and overhead services, material supply (granular, concrete and steel reinforcement), hard…

Details

Kettering Road, Market Harborough

Location Kettering Road, Market HarboroughBreheny Civil Engineering Value Circa  £493,749.84  Duration Contract started April 2021 – May 2021, 1 Month Duration  Scope Bulk Earthworks & Soil Stabilisation   Description   Installation of spine road to new housing development  Key Matters Inherit material suitability, surface water run-off, mass haul management, environmental issues, programme constraints, client critical path management.…

Details

Didcot Power Station, Oxfordshire

Location Didcot Power Station, Oxfordshire Value circa £420,000 Duration Contract started November 2019 – 6-week programme over one visit. Scope Cut to fill, soil modification of site won waste materials from power station to form development platforms. Description Utilize site won PFA to fill voids left over from the demolition of the cooling towers. Key…

Details

Mickle Well Park, Daventry

Location Mickle Well Park, Daventry Value circa £1,915,000 Duration Contract started July 2019 – 27-week programme over one visit Scope Site clearance, supply & install permanent site fencing, hard breakout of existing road, bulk earthworks, soil modification, supply and installation of farmers access road and 2nr. reinforced service protection slabs. Description Installation of bulk earthworks…

Details

London Medway, Kent

Location London Medway, Kent Value circa £300,000 Duration Contract started February 2020 – 7-week programme over one visit. Scope The construction of a distribution unit with car and HGV park. Description Cut to fill and modification of site won material, stabilise to 30% CBR final layer and import and place type 1 subbase to produce…

Details

Airport Way, Southend, Essex

Location Airport Way, Southend, Essex Value circa £750,000 Duration Contract was carried out June-August 2019 Feb-April 2020 – 23-week programme over two visits. Scope The production of a distribution unit with infrastructure roads, ponds and landscape bunds and ditches. Description Strip and stockpile topsoil for offsite disposal and reuse, cut and fill to finished levels,…

Details