Beaumont Rd, Wellingborough

Location Wellingborough Value Circa £382,000.00 Duration Contract started August – September. 2024, 5 Week Duration Scope Bulk Earthworks & Soil Modification Description Topsoil strip depth 215mm, relocate existing topsoil stockpiles, excavate to reduce levels within pond and excavate to reduce levels within cut profile, fill to formation. Soil modification of site won materials. Key Matters…

Details

Burleyfields, Stafford

Location Stafford Value Circa £485,000.00 Duration Contract started May – July. 2024, 9 Week Duration Scope Bulk Earthworks & Soil Modification Description Topsoil strip depth 300mm, relocate existing stockpiles, peat removal, excavate to reduce levels within pond and excavate to reduce levels within cut profile, fill to formation. soil modification of site won materials. SGE’s…

Details

Karesborough, Phase 2

Location Kraresborough Value Circa £187,500.00 Duration Contract started April – May. 2024, 4 Week Duration Scope Bulk Earthworks & Soil Stabilisation Description Excavate to reduce levels within cut profile, place materials to a temporary stockpile, proof roll & pre-trim sub formation prior to up-filling, Excavate stockpile and fill to formation. Soil modification & soil stabilisation…

Details

Whitford Road, Bromsgrove 

Location Whitford Road, Bromsgrove Value Circa £700,000.00 Duration Contract started Nov 2022 – Jan 2023, 3 Month Duration Scope Bulk Earthworks Description Topsoil strip depth 350mm placed to a temporary on-site stockpile, excavate to reduce levels within cut profile, fill to formation. Modification of site-won materials to achieve specification requirements for fill materials. Site won…

Details

Plot 15, Southend (CAMA)

Location Plot 15, Southend (CAMA)  Value Circa £ 90,000 Duration Contract started May 2023 & finished May 2023, 3 Week Duration Scope Bulk Earthworks Description Topsoil strip depth 200mm, excavate to reduce levels within cut profile, excavate to reduce levels within attenuation tank, fill to formation & place imported geotextile material. SGE’s scope also included…

Details

Plot 6, Southend (IPECO)

Location Plot 6, Southend (IPECO)  Value Circa £ 225,000 Duration Contract started May 2023 and finished June-July 2023, 2 Month Duration Scope Bulk Earthworks & Soil Stabilisation Description Removal of existing site shrubs & trees, topsoil strip depth 200mm, excavate to reduce levels within cut profile, excavate to reduce levels within on site imported stockpile,…

Details

Alloa, Midtown Phase 2 – BHC Ltd

  Location Alloa, Midtown Phase 2 – BHC Ltd Value Circa £ 1,700,000 Duration Contract started Sept – Oct 2022 & Mar – May 2023, 4 Month Duration Scope Bulk Earthworks & Soil Stabilisation Description Installation of temporary earthworks open grips, Topsoil strip depth 75mm, excavate to reduce levels within cut profile, fill to formation…

Details

Momentum London, Rainham

  Location Momentum, London Value Circa £ 540,000 Duration Contract started Dec 2022 – Jan 2023, 4 Month Duration Scope Bulk Earthworks & Modification Description Site scrape depth 100mm, topsoil strip depth 300mm, form temporary surface water attenuation, excavate to reduce levels within cut profile, fill to formation. Soil modification of site won materials to…

Details

DPD, Washington

Location DPD, Washington Value Circa  £ 530,000  Duration Contract started March 2021 – June 2021 3 Month Duration  Scope Bulk Earthworks, Soil Stabilisation & Modification   Description Warehouse Units  Key Matters Topsoil strip: depth 350mm haul and placed into soft landscapingHard landscaping to reduce levels and stockpiledHard breakout of existing steps & the like placed into…

Details

Quintus, Burton on Trent

Location Quintus, Burton on Trent – Bulk Earthworks Value Circa  £ 440,000  Duration Contract started June 2021 – September 2021, 3 Month Duration  Scope Bulk Earthworks, Soil stabilisation & Modification   Description  Ground Stabilisation for new warehouse units  Key Matters Topsoil strip to create a stockpile, Excavation to reduce levels, filling to make up levels, stabilised…

Details