Needham Chalk Pit, Suffolk
Needham Chalk Pit, Suffolk – A housing development requiring an existing lake to be filled and plateaus formed to receive vertical band drains
DetailsNeedham Chalk Pit, Suffolk – A housing development requiring an existing lake to be filled and plateaus formed to receive vertical band drains
DetailsDen Brook Wind Farm – bulk earthworks, excavation of swale system, soil modification & stabilisation and placing Type 1 sub base. 9 turbine wind farm construction. 20 week programme.
DetailsBedfont Rd, Heathrow – Bulk earthworks with soil remediation, crushing and screening, reprofiling existing watercourse system, placement of 6F capping and type 1 sub base. 8 week programme with works completed December 2015.
DetailsCopcut – Bulk Earthworks Project,15 week programme. Greenfield site converted into residential estate which is an extension of the existing Droitwich town footprint.
DetailsOtley Bridge – off site disposal circa 3,000m3, value engineered stabilised piling mat construction, import and place Type 1 sub base to the construction of a retirement home on a brownfield site.
DetailsLeybourne Chase Primary School, West Malling Kent
Bulk excavation circa 10,000 m3, 5% CBR soil modification, Placing granular materials
Acton, London – bulk excavation circa 15,000 m3, off site disposal circa 5000 m3, piling mat construction and removal on an inner city brownfield site.
DetailsLocation Swindon TNT Distribution Value circa £525,000 Duration Contract started January 2015, 8 week duration Scope Vegetation strip Bulk excavation cut to fill Soil modification and Stabilisation Supply, place and compact Type 1 Sub base Description Distribution Centre Key issues Detailed sequence of works for sectional handover of building (2 Phases) Dealing with unsuitable compressive soils…
DetailsLocation Plot 2 G Park – Enfield Value circa £100,000 Duration Contract started late February 2015, 4 week duration Scope Vegetation strip Bulk excavation Soil modification Attenuation tank excavation Placement of granular materials Description Site earthworks to level and form building footprint Key issues Detailed programme and weather References Available on Request from Eddie Ronald:…
DetailsSGE is pleased to announce the Wirtgen WR240i as a new addition to it’s plant fleet. The WR240i has a large working width and large working depth, with a high pulverising output and mixing capacity offering maximum flexibility for all soil stabilisation projects. Please contact Brian Heron anytime on 07841 341240 or brian@sgeworks.co.uk for more information…